Guest viewing is limited

Insulating cathedral\vaulted roof

  • Thread starter Steveb21
  • Start date
  • Replies 0
  • Views 37
Insulating cathedral\vaulted roof

Insulating cathedral\vaulted roof

Inquiry about completing a newly constructed cathedral/vaulted roof.

Rafters with a depth of 220mm

My current plan consists of the following:

- 50mm air gap (below the roof membrane)
- 120mm rigid board insulation
- 50mm gap/service void
- Plasterboard
- Skim coat

Questions:
*Is it acceptable to maintain the 50mm gap/service void above the plasterboard, or does the insulation need to be flush against the insulation for optimal efficiency? The reason for the 50mm gap/service void before...

Read more

by Steveb21

This has been automatically posted in the DIYNot Forum on DIY Talk. The new DIY Forum
 
Back
Top