Insulating cathedral\vaulted roof
Insulating cathedral\vaulted roof
Inquiry about completing a newly constructed cathedral/vaulted roof.
Rafters with a depth of 220mm
My current plan consists of the following:
- 50mm air gap (below the roof membrane)
- 120mm rigid board insulation
- 50mm gap/service void
- Plasterboard
- Skim coat
Questions:
*Is it acceptable to maintain the 50mm gap/service void above the plasterboard, or does the insulation need to be flush against the insulation for optimal efficiency? The reason for the 50mm gap/service void before...
Read more
by Steveb21
This has been automatically posted in the DIYNot Forum on DIY Talk. The new DIY Forum
Insulating cathedral\vaulted roof
Inquiry about completing a newly constructed cathedral/vaulted roof.
Rafters with a depth of 220mm
My current plan consists of the following:
- 50mm air gap (below the roof membrane)
- 120mm rigid board insulation
- 50mm gap/service void
- Plasterboard
- Skim coat
Questions:
*Is it acceptable to maintain the 50mm gap/service void above the plasterboard, or does the insulation need to be flush against the insulation for optimal efficiency? The reason for the 50mm gap/service void before...
Read more
by Steveb21
This has been automatically posted in the DIYNot Forum on DIY Talk. The new DIY Forum