Biscuit mix for UFH - admixture to speed drying?
Biscuit mix for UFH - admixture to speed drying?
I'm hoping to install a wet underfloor system between joists.
Going by the book, the drying time, is about a month for a 25mm biscuit screed.
It makes sense, but I wonder if I could blend in a small amount of accelerant admixture to speed the drying time.
Has anyone tried it? Or got an opinion?
by dentster
This has been automatically posted in the DIYNot Forum on DIY Talk. The new DIY Forum
Biscuit mix for UFH - admixture to speed drying?
I'm hoping to install a wet underfloor system between joists.
Going by the book, the drying time, is about a month for a 25mm biscuit screed.
It makes sense, but I wonder if I could blend in a small amount of accelerant admixture to speed the drying time.
Has anyone tried it? Or got an opinion?
by dentster
This has been automatically posted in the DIYNot Forum on DIY Talk. The new DIY Forum